Phase voltage inputs (io_b module), Load, Chapter 2: installation electrical installation – GE Industrial Solutions MX350 Instruction manual User Manual

Page 27

Advertising
background image

CHAPTER 2: INSTALLATION

ELECTRICAL INSTALLATION

MX350 AUTOMATIC TRANSFER CONTROL SYSTEM – INSTRUCTION MANUAL

2–11

Phase voltage inputs

(IO_B module)

The MX350 has three channels for AC voltage inputs. There are no internal fuses or ground
connections on the voltage inputs. Polarity is critical for correct power measurement and
voltage phase reversal operation.

Figure 12: Wye voltage connection

Figure 13: Delta voltage connection

A

C

B

+

D1

D2

D4

D3

Phase voltage inputs

Auto Transfer Control

D5

D6

D7

VT1

VT2

VT3

Control power

L

N

D8

N/C

+

C1

C2

C4

C3

Phase voltage inputs

Auto Transfer Control

889735A1.CDR

C5

C6

C7

VT1

VT2

VT3

Control power

L

N

C8

N/C

N

Typically
generator

Typically
utility

LOAD

A

C

B

+

D1

D2

D4

D3

Phase voltage inputs

Auto Transfer Control

D5

D6

VT1

VT2

VT3

Control power

L

N

D7

D8

N/C

+

C1

C2

C4

C3

Phase voltage inputs

Auto Transfer Control

889736A1.CDR

C5

C6

VT1

VT2

VT3

Control power

L

N

C7

C8

N/C

From
Source 2
(generator)

From
Source 1
(utility)

LOAD

Advertising