Operation setpoints, Operation setpoints - 14 – GE Industrial Solutions MX350 Instruction manual User Manual

Page 88

Advertising
background image

5–14

MX350 AUTOMATIC TRANSFER CONTROL SYSTEM – INSTRUCTION MANUAL

OPERATION SETPOINTS

CHAPTER 5: SETPOINTS

Operation setpoints

Operation setpoints define the acceptable electrical and time limits for both Source 1 and
Source 2. These setpoints define dropout and restore values for over and undervoltage,
over and under frequency, as well as the associated time delays.

In addition, the screen for Source 2 (usually an engine generator set) has a setpoint for
Auto Loadshed Underfrequency. If this feature is enabled, a programmed output can be
used to shed part of the switch load via a downstream breaker. Also, if it is enabled the
user has to setup the variables for the corresponding parameters.

NOTE

NOTE:

Additional customer wiring is required to use the Auto Load Shed feature.

Advertising