Galaxy Power System GPS2436

Issue 1 August 2012

37

9 Millennium II Controller Operation

The Millennium II is factory pre-installed and pre-configured with industry standard

defaults for thresholds and feature operability in GPS cabinet applications. In addition,

customer specific default controller settings may be available upon request. This

section provides:

Preparation and Precautions
Procedures for the proper addition of optional packs
Input and output wiring to the controller and the installation and

wiring of optional features
Controller default configuration information such as alarm severity

and description, system voltage, shunt information
Controller configuration information

Preparation

The following

Installation

procedures

should be

performed

AFTER:

• All the equipment frames (initial and supplemental bays, free-

standing rectifiers, etc.) are anchored in place.

• The battery stands have been erected and the batteries

installed.

• The overhead cable racks have been installed and the power

cables have been run and terminated.

• The plant’s charge and discharge bus bar assemblies have been

installed.

But BEFORE:

• Connecting the batteries to the plant charge and discharge bus

bars or turning up the plant rectifiers.

Precautions
Observe ESD protection while installing circuit packs.

Wear grounded antistatic wrist straps when handling all circuit packs. The wrist strap

must contact the skin and is not to be worn over clothing.

Never hand a circuit pack from a grounded to a non-grounded person or vice-versa.