GE Industrial Solutions Millennium II Controller J85501P-1 User Manual

Page 101

Advertising
background image

Basic Installation and User’s Guide for the Millennium II Controller

Issue 3 January 2008

101

Enabled if Millennium was 1
Disabled if Millennium was 0

SW203-5 Full

Access

through

Aux Port

Using the front panel, go to:

MenuÆConfigÆComm PortsÆAux Port

Config Write to:

Enabled if Millennium was 1
Disabled if Millennium was 0

SW203-4 Full

Access

through

Modem Port

Using the front panel, go to:

MenuÆConfigÆComm PortsÆModem

Port

Config Write to:

Enabled if Millennium was 1
Disabled if Millennium was 0

SW203-3 Modem/Local/Aux

Setting Config

Set SW202-7 to:

0 if Millennium was 0
1 if Millennium was 1

SW203-2 Local

Port(Event

Log or Terminal)

Using the front panel, go to:

MenuÆConfigÆComm PortsÆLocal Port

Config Application to:

Event Log if Millennium was 1
Terminal if Millennium was 0

SW203-1

Aux Port(RS232 or
RS485)

Set SW202-5 to:

0 if Millennium was 0
1 if Millennium was 1

SW204(4-8) NOT USED

Not Applicable to Millennium II

SW204-3 Enhanced

Remote

Security

Set SW202-6 to:

0 if Millennium was 0
1 if Millennium was 1

SW204-2

Remote Alarm Test

Not Used

SW204-1 Rectifier

Energy

Management

Using the front panel, go to:

MenuÆConfigÆPlant

Config Efficiency to:

Enabled if Millennium was 1
Disabled if Millennium was 0

Advertising