GE Industrial Solutions Millennium II Controller J85501P-1 User Manual

Page 84

Advertising
background image

Basic Installation and User’s Guide for the Millennium II Controller

Issue 3 January 2008

84

8.

Removing the Forced Contactor Conditions

If Battery and Load contactors are in the system, contactor control boards should have be
configured so that they did not OPEN during the controller replacement.
NOTE: Contactors may have always been in the FORCED state per customer
requirements. If no changes were made to the Contactor States in the “Securing
Contactors” section, then DO NOT change the switch positions.
To return contactors to their normal state, place SW300 in the position as shown
In figure 6-2 and 6-3.




Contactor Type

Control Board and

Switch

Under Millennium II

Control

Load

EBV – SW300

DOWN

Battery

BJN – SW300

DOWN for ½ height

cabinets

UP for full height

cabinets

9.

If a Gateway or Data Switch option will be used, see the New Installation section for
instructions.


Advertising