GE Industrial Solutions Millennium II Controller J85501P-1 User Manual

Page 77

Advertising
background image

Basic Installation and User’s Guide for the Millennium II Controller

Issue 3 January 2008

77

If a Modem is to be installed:
Please see the Modem installation section, in this
manual.


4.

Connect Alarm Wiring

Step Action

a.

On the controller, locate the BSL alarm block. It is
located in the upper right hand corner of the MCR1
board. (see Figure 6-6)

NOTE:

It is very important, in the next step, to follow the
Alarm Input/Output table in this manual when
connecting the alarms. Some Pins may have
changed their function.

b.

Route the alarm wires through the open holes above
the alarm block and terminate them accordingly. You
may need to reference the Millennium II Alarm
Input/Output section for proper connections.


Step Action

5.

Controller Power Up

Step Action

NOTE:

F1 is the bottom of the two fuses.

a.

Using a fuse puller, remove F1 on the MCR1 board.
This is the controller power fuse.

(see Figure 6-6)

b.

Next, locate P6 at the right hand corner of the
MCR1 board. (see Figure 6-6)

c.

Route the J6 power connector through the top right
opening of the controller housing. Secure this to P6.

d.

Using a fuse puller, Install F1 on the MCR1 board.

e.

Observe the controller power up sequence.


Hardware/Software Dip Switch Settings


Some features which originally required enabling/disabling through a dip switch, now
require software enabling.

Advertising