GE Industrial Solutions Millennium II Controller J85501P-1 User Manual

Page 96

Advertising
background image

Basic Installation and User’s Guide for the Millennium II Controller

Issue 3 January 2008

96

4.

Install Data Switch Cables

Step Action

a.

b.

If NO circuit board was connected to P205, on
the old Millennium,
then proceed to the next item
for connection.
If a circuit board was connected to P205, with
DB9 connectors
AND
the Data Switch option is installed (circuit
pack connected to P205), connect them to Data
Switch Ports 1-3.
IF the Data Switch card has not yet been
installed,
please see Data Switch installation
section in this manual.


5.

Install Gateway (LAN) Cable

Step Action

a.

On the controller (MCR1), locate P2 (Gateway
LAN). It is located at the bottom of the controller.
(see Figure 6-11)

b.

If NO Gateway card was installed in the
Millennium,
then proceed to the next item for
connection.
If Gateway card was installed in the
Millennium:

1. Take the existing LAN cable and route it

through the top of the controller housing

2. Down the right side
3. Through the bottom of the housing
4. Under the display cable
5. Connect it P2 on the MCR1.


Advertising