Verification dialog (see – Teledyne LeCroy Sierra M6-2 SAS_SATA Protocol Analyzer User Manual User Manual

Page 258

Advertising
background image

Teledyne LeCroy

SAS Verification (SAS)

256

 

 

Sierra M6‐2 SAS/SATA Protocol Analyzer User Manual

Figure 3.73: Run Verification Scripts Dialog

Speed Negotiation has Speed Negotiation Window Three and Train Speed Negotiation
Window.

The Link Layer has Link Reset, Connections, SSP Frames,
Closing SSP Connections, Connections through Expanders, and Break.

The Transport Layer has SSP Frames Structures, Command IU, Data IU,
XFER_RDY IU, Response IU, and Error Handling.

The Application Layer has SCSI CDB, STP and NACA Operations.

2. Choose the tests in the left pane of the dialog and click the Add>> button.
3. Enter a value for DUT Type: Target, Initiator, or Expander.
4. Enter the DUT Name.
5. Enter a value for the Number of Runs to run a particular test more than once.
6. Enter the Connection Rate as Autospeed or a value.
7. To view failed test traces in the trace viewer, check the

Automatically load failed test traces into Sierra trace viewer check box.

Advertising