85330A Multiple Channel Controller

2-13

Performance Verification

Verifying the RF Switches

Verifying the RF Switches

This portion of the verification will check the switches to make sure that
they are switching correctly. This portion will also test the RF performance
of the switches.

Switch Setup

1. Turn OFF the multiple channel controller before making any

connections.

2. Connect each switch to its switch control unit. Use the supplied switch

drive cable.

3. Connect the switch to the network analyzer. An example of this setup is

shown in

Figure 2-5

. Note that all of the switch ports will be tested, so

make sure that there is enough room to connect all of the ports to the
network analyzer.

4. Turn ON the multiple channel controller.

Figure 2-5

RF Switch Test Setup