Tools required for assembly/disassembly, Disassembly – JLG 460SJ Service Manual User Manual

Page 280

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-16

– JLG Lift –

3120895

Tools Required for Assembly/Disassembly

Upon assembly and disassembly of the actuator there are
basic tools required. The tools and their intended func-
tions are as follows:

1. Flashlight- helps examine timing marks, component

failure and overall condition.

2. Felt Marker- match mark the timing marks and out-

line troubled areas.

3. Allen wrench- removal of port plugs and setscrews.

4. Box knife- removal of seals.

5. Seal tool- assembly and disassembly of seals and

wear guides.

6. Pry bar- removal of end cap and manual rotation of

shaft.

7. Rubber mallet- removal and installation of shaft and

piston sleeve assembly.

8. Nylon drift- installation of piston sleeve.

9. End cap dowel pins- removal and installation of end

cap (sold with Helac seal kit).

The seal tool is merely a customized standard flat head-
screwdriver. To make this tool you will need to heat the flat
end with a torch. Secure the heated end of the screwdriver
in a vice and physically bend the heated end to a slight
radius. Once the radius is achieved round off all sharp
edges of the heated end by using a grinder. There may be
some slight modifications for your own personal prefer-
ence.

Disassembly

1. Remove the cap screws (113) over end cap lock

pins (109).

2. Using a 1/8” (3.18mm) drill bit, drill a hole in the cen-

ter of each lock pin to a depth of approximately 3/
16” (4.76mm).

3. Remove the lock pins using an “Easy Out” (a size

#2 is shown). If the pin will not come out with the
“Easy Out”, use 5/16” drill bit to a depth of 1/2”
(12.7mm)todrill out the entire pin.

Advertising
This manual is related to the following products: