Swing bearing torque value, Swing drive installation, Swing bearing torque sequence -47 – JLG 460SJ Service Manual User Manual

Page 99: Drive motor adjustment -47, Figure 3-33., swing bearing torque sequence, Own in figure 3, , swing bearing torque sequence tig

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3120895

– JLG Lift –

3-47

14. Using all applicable safety precautions, activate the

hydraulic system and functionally check swing sys-
tem for proper and safe operation

.

Swing Bearing Torque Value

Install with Loctite - 190 ft. lbs. (260 Nm).

Swing Drive Installation

1. Insure that the T/T mounting plate is clean and free

of paint runs and drips.

2. Mount swing drive motor to mounting plate.

3. Position Swing drive to location of bearing gear max

eccentric tooth. (high spot) High spot is marked with
yellow paint in tooth.

4. Slide drive motor into swing gear and shim to

achieve +.008”/.012” backlash.(+.20mm /30mm)

5. Torque four 3/4-10 Soc. hd. Cap Scrs. with Loctite

#242 to 285 ft.lbs. (386 Nm).

6. Torque six 5/8-11Hex. hd. Cap Scrs. to 190 ft. lbs.

(260 Nm)

.

Figure 3-33. Swing Bearing Torque Sequence

Figure 3-34. Drive Motor Adjustment

Advertising
This manual is related to the following products: