Managing projects, Project structure – Rockwell Automation 1492-PRINT110_PRINT220 ClearTools User Manual User Manual
Page 91
User Manual
Managing projects
85
Managing projects
Project structure
A project (1) can be made up of a number of subprojects (2).
These subprojects can contain any number of Marker Cards.
A marker type can consist of several pages (4) and can include a range of elements, such as
text, barcodes, images and shapes like lines, rectangles, etc. All images and barcodes are
stored in dedicated folders.
Depending on its type, a Marker Card consists of a defined number of marker areas (6) and
project areas (5), arranged in horizontal and vertical fields.
The marker areas are the areas actually containing the labeling information. They are on the
marker layer.
The project areas are used to assign the marker to a particular project. They are on the project
layer.
A project can have more than one marker type (3)