6 adding a second power supply module – Kontron CG2100 Carrier Grade Server User Manual

Page 48

Advertising
background image


47

3.

Secure the IBBU module to the bottom of the RAID module with the three screws in

the kit packet. (Figure 39 “A”)

Figure 39. Securing the IBBU to the RAID Module

4.6

Adding a Second Power Supply Module

Depending on which model you order, your server has one AC or one DC power supply
module. A second power supply provides redundancy. The power supply modules are hot-
swappable, so no chassis components have to be removed to add or replace a module. To
add a second power supply module:

1.

Remove the filler panel. (Figure 40, “A”)

2.

Press and hold the green safety lock downward and using the handle, slide the power

supply into the slot until it latches into place. (“B” and “C”)

3.

If you are installing a DC power supply, there are two threaded studs for chassis

enclosure grounding.
(“D”)
A 90°standard barrel, two-hole, compression terminal lug with 5/8-inch pitch
suitable for a #14-10 AWG conductor must be used for proper safety grounding. A
crimping tool may be needed to secure the terminal lug to the grounding cable.

4.

If this is the last task you are performing, replace the processor air duct, the

riser card assembly, and the back chassis cover.
Reconnect all the external devices and plug in the power cord(s).

Figure 40. AC and DC Power Supplies

Advertising