Installing the new server board – Kontron CG2100 Carrier Grade Server User Manual

Page 74

Advertising
background image


73

Figure 65. Removing the Server Board

Installing the New Server Board

1.

Set the replacement server board into place.

Insert the rear edge of the board first and line up the I/O ports with the slots in
the rear panel of the chassis.

2.

Make sure all three self-aligning standoffs go through the holes at the front of

the board. (Figure 65, “B”)

NOTE: If the standoffs are misaligned when the board is screwed down the holes will be

damaged and the standoffs may be cross-threaded.

3.

Fasten the server board to the chassis base with the nine screws that were removed

and saved.

If the new server board does not have components pre-installed and you are re-using
components from the old server board, install components as follows”

To install memory DIMMs, see “Installing Memory DIMMs” in Section 3.3.
To install heat sink(s) and processor(s), see “Installing a New Processor” in

Section 3.3.

4.

Re-install the personality module(s) if used. For information about how these cards

are installed, see Section 4.9, “Installing a Personality Module”.

5.

Re-install the GCM4 module if used. For information about how this card is

installed, see Section 4.10, “Installing a Remote Management Module”.

6.

Re-install the bridge board. For instructions, see “Re-Installing the Bridge Board”

in Section 5.3.

7.

Re-connect the serial port connector to the bridge board. See Figure 25 for the

cable connector location

8.

Re-connect the TAM signal cable that runs from the module to the rear panel of the

chassis.

Advertising