Rice Lake iQUBE2 Digital Diagnostic Junction Box User Manual

Page 10

Advertising
background image

6

iQUBE

2

Installation Manual

• For cables with foil shielding, strip insulation and foil from the cable half an inch (15 mm) past the grounding

clamp (see Figure 2-1). Fold the foil shield back on the cable where the cable passes through the clamp.
Ensure silver (conductive) side of foil is turned outward for contact with the grounding clamp.

• For cables with braided shielding, strip cable insulation and braided shield from a point just past the ground-

ing clamp. Strip another half inch (15 mm) of insulation only to expose the braid where the cable passes
through the clamp (see Figure 2-1).

Figure 2-1. Cable Grounding

• For load cell cables, cut the shield wire just past the grounding clamp. Shield wire function is provided by

contact between the cable shield and the grounding clamp.

• Route stripped cables through cord grips and clamps. Ensure shields contact grounding clamps as shown in

Figure 2-1. Tighten grounding clamp nuts.

• Finish installation using cable ties to secure cables inside of indicator enclosure.

Cord grip

Insulated cable

Foil

(silver side out)

Grounding clamp

Shield wire

(cut)

Length of foil before folding
back on cable insulation

Cut insulation here
for foil-shielded cables

Braid

Cut insulation here
for braided cables

NOTE: Install lockwashers
first, against enclosure,
under grounding clamp

Advertising
This manual is related to the following products: