Attach transition sub, Attach beacon housing, Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual

Page 100

Advertising
background image

Conduct a Bore - 100

JT60/JT60 All Terrain Operator’s Manual

Assemble Drill String

Attach Transition Sub

Use either machine torque or Hydratong wrenches to attach transition sub.

Machine Torque

1.

Pull transition sub into front wrench.

2.

Close wrench.

3.

Lube joints.

4.

Slowly make up joint.

5.

Use full machine torque to tighten joint fully.

Hydratong

1.

Lube joints with TJC.

2.

Attach Hydratong to the joint in the join position and tighten joint. See “Hydratong Wrenches” on
page 141.

Attach Beacon Housing

1.

Attach downhole tool to transition sub and hand tighten.

2.

Attach Hydratong to the joint in the join position and tighten joint. See “Hydratong Wrenches” on
page 141.

Advertising
This manual is related to the following products: