Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual

Page 148

Advertising
background image

Systems and Equipment - 148

JT60/JT60 All Terrain Operator’s Manual

Pipe Boxes

Remove Pipe Box

1.

Insert lift pin block (2) (see page 147) and secure with lift pin (1) and lynch pin (6).

2.

Raise pipe with pipe lifter on machine.

3.

Move support pins (4) from top of pipe box (3) and insert under both ends of pipe box. Secure with
lynch pins.

4.

Attach chain to lift pin block.

5.

Loosen four pin retainer bolts (8). Two bolts are located on each end of the pipe box.

6.

Pull rear pins (5) and front pin (7) and lift box off drill frame. See “Pipe Box Lifting Procedure” on
page 88 for more information.

Install Pipe Box

1.

Guide pipe box onto centering pin on rear of pipeloader frame. Lower completely onto frame.

2.

Insert rear and front pins (5, 7).

3.

To bolt pipe box onto drill frame, tighten four retainer bolts (8). Two bolts are located on each end of the
pipe box.

4.

Raise pipe with pipe lifter on machine.

5.

Remove bottom support pins (4) from both ends of pipe box. Store support pins in holes on top of pipe
box (3).

j07om035c.eps

3

5

4

2

1

6

7

8

Advertising
This manual is related to the following products: