Service - 180

JT60/JT60 All Terrain Operator’s Manual

Startup/10 Hour

Check Pipe Auto Lubricator TJC Level

Check pipe auto lubricator TJC level before
startup and every 10 hours of operation. Change
pail as needed. See “Change Auto Lubricator
TJC Pail” on page 199 for procedure

Clean Drilling Fluid Y-Strainer

Clean drilling fluid y-strainer before startup and
every 10 hours of operation. Ensure that strainer
is free of debris.

NOTICE: Ditch Witch tool joint compound is
specially formulated to work with Ditch Witch
pipe lubrication system. Use of other tool joint
compounds will clog system. See
“Recommended Lubricants/Service Key” on
page 170 for more information.