Beacon housings, Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual

Page 137

Advertising
background image

JT60/JT60 All Terrain Operator’s Manual

Systems and Equipment - 137

Downhole Tools

Installation

Remove all paint from mating surfaces before attaching any bit to housing. Install screws (p/n 107-284)
and torque bolts to 580 ft•lb (800 N•m).

Beacon Housings

Beacon Installation

To ensure beacon is installed correctly in rock housing, place battery end of beacon away from bit end of
housing.

Lid Installation

1.

Clean all threads, bolt holes and mating
surfaces.

2.

Follow torque sequence (shown).

3.

Use removable thread locker (Loctite

®

or

equivalent), if desired.

4.

Torque bolts to 60-70 ft•lb (81-95 N•m).

5.

Repeat torque sequence.

Soil

Description

sandy soil

sugar sand, blow sand, or other soils where sand is the predominant component

soft soil

sandy loam

medium soil

loams, loamy clays

hard soil

packed clays, gumbo, all compacted soils

rocky soil

chunk rock, glacial till, cobble, rip rap, gravel

soft rock

soft limestone, sandstone, shale, coral, caliche

hard rock

granite, schist, marble, hard limestone

Advertising
This manual is related to the following products: