Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual

Page 150

Advertising
background image

Systems and Equipment - 150

JT60/JT60 All Terrain Operator’s Manual

Pipe Boxes

Add Single Pipe

1.

Position additional drill pipe box near machine.

2.

Ensure shuttle stop is fully lowered.

3.

Move shuttles out fully.

4.

Stop drilling.

5.

Pull and hold pins (1) on each shuttle and
slide out auxiliary pipe loaders (2).

6.

Remove pipe stop (stored on outside of drill
frame) and attach to front of pipe box.

Advertising
This manual is related to the following products: