JT60/JT60 All Terrain Operator’s Manual

Systems and Equipment - 153

Pipe Boxes

4.

Remove pipe stop (stored on outside of drill
frame) and attach to front of pipe box.

5.

Raise pipe in row 4.

6.

Move pipe to auxiliary pipe loaders.

Move shuttles in.

Lower pipe into auxiliary pipe loaders.

7.

Move shuttles out.

8.

Remove pipe from auxiliary pipe loaders and store properly.

9.

Repeat steps 5-8 to unload remaining added drill pipe.

10. After all added drill pipe is unloaded with auxiliary pipe loaders:

Close both auxiliary pipe loaders.

Remove pipe stop and store it on drill frame.

Step away from pipeloader.

Finish loading remaining drill pipe into row 4 using standard procedure. See “Remove Pipe” on
page 114.

Crushing weight. If load falls or moves it could kill or crush you. Use

proper procedures and equipment or stay away.

To help avoid injury:

have enough people on hand to manually add or remove single pipe to pipe box.

move 10’ away from machine after pipe is placed in auxiliary pipe loaders.