Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual

Page 151

Advertising
background image

JT60/JT60 All Terrain Operator’s Manual

Systems and Equipment - 151

Pipe Boxes

7.

Load a pipe in auxiliary pipe loaders and rest it against pipe stop.

8.

Move at least 10’ away from the machine.

9.

Move auxiliary pipe loaders under row 4 (row 3 if using AT pipe).

10. Raise pipe into row 4.

11. Move shuttles all the way out.

12. Repeat steps 8-12 to load more pieces of pipe into row 4.

13. Move pipe to pipeloader grippers.

Raise last pipe into row 4.

Move shuttles out.

Lower pipe into front grippers.

14. Before operating pipeloader:

Close both auxiliary pipe loaders.

Remove pipe stop and store it on drill frame.

Step away from drilling unit.

Crushing weight. If load falls or moves it could kill or crush you. Use

proper procedures and equipment or stay away.

To help avoid injury:

have enough people on hand to manually add or remove single pipe to pipe box.

move 10’ away from machine after pipe is placed in auxiliary pipe loaders.

Advertising
This manual is related to the following products: