2000 hour, Drilling unit, Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual

Page 197

Advertising
background image

JT60/JT60 All Terrain Operator’s Manual

Service - 197

2000 Hour

2000 Hour

Drilling Unit

Change Engine Coolant

Drain cooling system at drain every two years or
2000 hours. Drain cooling system at drain (3) and
refill at radiator cap (2) with approved coolant.
Capacity is 7.7 gal (29 L). Check level at sight
glass (1).

Location

Task

Notes

DRILLING
UNIT

Change engine coolant

NOTICE:

Coolant change interval depends on
coolant used and whether SCA levels are
properly maintained. Read note above
carefully to ensure coolant is changed at
the correct interval.

The use of non-approved coolant may lead
to engine damage or premature engine
failure and will void engine warranty.

Use only distilled water for mixing coolants.
Do not use tap water.

See “Recommended Lubricants/Service
Key” on page 170 for list of approved
coolants.

j40om062w.eps

1

2

3

Advertising
This manual is related to the following products: