Connector for power supply/regenerative unit (cna), English, L2 l1 – Yaskawa Junma Series SERVOPACK User Manual

Page 32

Advertising
background image

3.8 Wiring the Power Supply/Regenerative Unit Connector (CNA)

E-31

English

5. Connect the connector to the SERVOPACK.

After wiring the connector, reconnect the connector to the SERVOPACK.

* A 100 VAC power supply can be used with a SERVOPACK version 03404 or firmware version 0004 or later.

Note: 1. Pull lightly on the wires to confirm that they are securely connected.

2. Be sure that none of the insulating sheaths of the wires are caught in the springs.

„ Connector for Power Supply/Regenerative Unit (CNA)

Pin No.

Symbol

Signal Name

1

L1

Power supply input terminals

2

L2

3

+

Regenerative unit connection
terminals

4

A

4

3

2

1

N

Power supply/Regenerative Unit connector
04JFAT-SBXGF-N
(Manufactured by JST. Mfg. Co., Ltd.)

1

L2

L1

2

3

4

Power supply

Single-phase, 200 VAC, 100 VAC*

Molded-case circuit breaker

Noise filter

Magnetic contactor

AC reactor

Regenerative Unit

+(Y3)

Y4

Y5

C1

C2

CNA connector

200V

YASKAWA

SJDE- 04 APA-OY

FIL

PULSE

REF

AL1
AL2
AL3

C
N

1

C
N

2

PWR

C

0

8

9

A

B DE

F

45

3

2

6

7

1

C

0

8

9

A

B DE

F

45

3

2

6

7

1

Fuse

Fuse

L1

L2

+

U

V

W

Advertising
This manual is related to the following products: