teSt 62 – check Wire 56 VoltaGe

DISCUSSION:
During an automatic start or when starting manually,
a crank relay on the circuit board should energize.
Each time the crank relay energizes, the circuit board
should deliver 12 VDC to a starter contactor relay
(SCR), or starter contactor (SC), and the engine
should crank. This test will verify (a) that the crank
relay on the circuit board is energizing, and (b) that
circuit board action is delivering 12 VDC to the starter
contactor relay or starter contactor.

PROCEDURE:

1. Set a VOM to measure DC voltage.
2. Connect the positive (+) test probe of a DC voltmeter

(or VOM) to the Wire 56 connector of the starter

contactor relay (SCR, on models with V-twin engines)

or the starter contactor (SC, on models with single

cylinder engines). Connect the common (-) test probe

to frame ground.

3. Observe the meter. Then, set the AUTO-OFF-MANUAL

switch to the MANUAL position. The meter should

indicate battery voltage. If battery voltage is measured,

stop testing and refer back to flow chart.

4. Navigate to the Digital output display screen.

a. Press “ESC” until the main menu is reached.

b. Press the right arrow key until “Debug” is flashing.

c. Press “Enter”.

d. Press the right arrow key until “Outputs” is flashing.

e. Press “Enter”.

f. Digital Output 6 is Wire 56 output from the

board. Refer to Figure 6.

5. Actuate the AUTO-OFF-MANUAL switch to the MANUAL

position and observe digital output Number 6. If the

printed circuit board is working correctly output Number

6 will change from a “0” to a “1”. If output did not change

replace printed circuit board.

6. Set a VOM to measure resistance.

note: remove 7.5 amp fuse before disconnecting
j1 connector.

7. Remove Wire 56 from the starter contactor relay (V-twin

units) or from the starter contactor (single cylinder

units). Connect one meter test lead to disconnected

Wire 56. Remove the J2 Connector from the printed

circuit board. Connect the other test lead to Wire 56 at

J2. CONTINUITY should be measured. If CONTINUITY

is not measured, repair or replace Wire 56.

RESULTS:

1. If battery voltage is indicated in Step 3 refer back to

flow chart.

DEBUG

OUTPUTS

OUTPUT 6

OUTPUTS 1 - 8:

1 0 1 1 0 0 0 1

Figure 6. The Home Page, Debug and Output Screens

teSt 63 – teSt Starter contactor

relay (V-tWin only)

DISCUSSION:
The starter contactor relay (SCR) located in the con-
trol panel must be energized for cranking to occur.
Once the SCR is energized, it’s normally open con-
tacts will close and battery voltage will be available
to Wire 16 and to the starter contactor (SC).

COM

NO

16

13

56

0

13

16

0

56

Figure 7. The Starter Contactor Relay

Part 4

DC CONTROL

sEctioN 4.4

DiaGNostic tEsts