3 – troubleshooting flowcharts, Introduction to troubleshooting, Part 3 – Generac Power Systems 8 kW LP User Manual

Page 72: Troubleshooting flow charts

Advertising
background image

introduction to trouBleShootinG

The first step in troubleshooting is to correctly identify the problem. Once that is done, the cause of the an be
found by performing the tests in the appropriate flow chart.
Test numbers assigned in the flow charts are identical to test numbers in Section 3.4, “Diagnostic Tests.” Section
3.4 provides detailed instructions for performance of each test.

BAD

BAD

REPAIR OR REPLACE AS NEEDED

REPLACE

GOOD

GOOD

GOOD

FIND CAUSE OF NO AC OUTPUT TO
TRANSFER SWITCH FROM GENERATOR

TEST 26 – CHECK

VOLTAGE AT

TERMINAL LUGS

E1 & E2

TEST 27 – CHECK

MANUAL TRANSFER

SWITCH OPERATION

TEST 28 – CHECK #23

AND #15B WIRING

CONNECTIONS

BAD

REPAIR AS NEEDED

TEST 30 – CHECK

STANDBY CONTROL

CIRCUIT

TEST 29 – TEST

TRANSFER

RELAY

BAD

BAD

GOOD

REPAIR OR REPLACE MECHANISM

Problem 7 – In Automatic Mode, No Transfer to Standby

Page 70

Part 3

TRANSFER SWITCH

sEctioN 3.3

trouBlEsHootiNG floW cHarts