Test 32 – utility control circuit – Generac Power Systems 8 kW LP User Manual

Page 82

Advertising
background image

(2) Press the right arrow key until “Debug” is

flashing.

(3) Press “Enter”.

(4) Press the right arrow key until “Outputs” is

flashing.

(5) Press “Enter”.

(6) Digital Output 8 is Wire 23 output from the

board. Refer to Figure 5.

(7) If Output 8 shows a “1” then the control

board is grounding Wire 23. Replace the
printed circuit board.

c. If 0 VDC is measured, the Wire 23 circuit is

good. Refer to flow chart.

DEBUG

OUTPUTS

OUTPUT 8

OUTPUTS 1 - 8:

1 0 1 1 0 0 0 1

Figure 5. The Home Page, Debug and Output Screens

6. Locate the terminal strip in the generator control panel.

Disconnect Wire 23 coming in from the transfer switch

(customer connection, side-see Figure 6).

7. Connect the positive (+) meter test lead to Wire 15B at

the terminal strip in the generator. Connect the nega-

tive (-) meter test lead to Wire 23 just removed from

the terminal strip.

a. If 0 VDC is measured, proceed to Step 8.

b. If 12 VDC is measured, a short to ground exists

on Wire 23 between the generator and transfer
switch. Repair or replace Wire 23 as needed
between generator control panel and transfer
switch relay (TR1).

8. Locate the terminal strip in the generator control panel.

Disconnect Wire 23 coming in from the transfer switch

(customer connection, side - see Figure 6).

GENERATOR

TERMINAL STRIP

CUSTOMER SIDE

N1/N2

CONTROL BOARD

CONNECTION

0

N1 N2

15B 23

Figure 6. Transfer Relay Test Points

9. Disconnect the J2 connector from the printed circuit board.
10. Set VOM to measure resistance.
11. Connect one meter test lead to Wire 23 connected at

generator terminal strip. See Figure 6. Connect the other

meter test lead to control panel ground.

a. If INFINITY or open is measured, replace the

printed circuit board

b. If continuity measured, Wire 23 is shorted to

ground. Repair or replace Wire 23 between the
J2 connector and the generator terminal strip.

teSt 32 – utility control circuit

DISCUSSION:
Printed circuit board action controls grounding Wire
23 to initiate a transfer to standby. When Wire 23 is
grounded the transfer relay (TR1) is energized. To
initiate a transfer back to utility the TR1 relay must be
de-energized. If Wire 23 is grounded, TR1 will always
be energized.

PROCEDURE/ RESULTS:
Refer to Figure 7.

1. Turn off utility supply voltage to the transfer switch.
2. Set VOM to measure AC voltage.
3. Set the generator AUTO-OFF-MANUAL switch in the

OFF position. Remove Wire 15B from the transfer switch

terminal strip.

4. Verify the transfer switch is down in the standby position.

Page 80

Part 3

TRANSFER SWITCH

sEctioN 3.4

DiaGNostic tEsts

Advertising