Utility source voltage failure, Operational analysis part 3, Page 63 – Generac Power Systems 8 kW LP User Manual

Page 65

Advertising
background image

NEUTRAL

CONNECTION

SWITCH

SW3

NO

C1

COM

SW2

VR1

NC

NC

COM

C2

VR2

NO

TR1

15B

23

1

7

4

7 9

3

6

9

F2

CIRCUIT 10

BLACK (MAIN 1)

CONTROL

TRANSFER

RED (MAIN 2)

NEUTRAL (WHITE)

NEUTRAL (WHITE)

23

0

F1

N2

N1

15B

23

BLACK

RED

N2

N1

15B

240VAC TO

TO GENERATOR

OUTPUT

PANEL

MAIN DISTRIBUTION

T1

T2

T1

T2

E2

E2

E2

E2

E1

E1

N1A

N1A

N2A

N2A

B

B

B

B

B

E1

E1

E1

N1A

N1A

N1A

15B

23

E1

E2

205

205

126

126

E2

N1A

N2A

N2A

A

N2A

240VAC

OUTPUT

GENERATOR

TS TO

CONTROL PANEL

A

B

SW1

LC

CIRCUIT 9

CIRCUIT 6

CIRCUIT 5

CIRCUIT 2

CIRCUIT 1

CIRCUIT 3

CIRCUIT 4

CIRCUIT 7

CIRCUIT 8

CIRCUIT 11

CIRCUIT 12

CIRCUIT 13

CIRCUIT 14

CIRCUIT 16

CIRCUIT 15

14 CIRCUIT LO

AD CENTER

12 CIRCUIT LO

AD CENTER

10 CIRCUIT LO

AD CENTER

8 CIRCUIT LO

AD CENTER

T1

T1

F3

0

WIRE

-

WIRE

BLK

+

RED

BC

0

16 CIRCUIT LO

AD CENTER

BC-BATTERY CHARGER

N-NEUTRAL

TR1-TRANSFER RELAY

SW2,SW3-LIMIT SWITCHES

TB1-TERMINAL STRIP

F1,F2,F3-5A, 600V FUSE

C1-UTILITY COIL & RECTIFIER

C2-GENERATOR COIL & RECTIFIER

SW1-AUTOMATIC TRANSFER SWITCH

(16 CIRCUIT SHOWN FOR REFERENCE ONLY)

LC-CIRCUIT BREAKER (LOADS)

LEGEND

SENSING

UTILITY

INSIDE

GROUND (GREEN)

GROUND (GREEN)

UTILITY

GENERATOR

GROUND

DC

utility Source VoltaGe Failure

If utility source voltage should drop below a preset value, the generator circuit board will sense the dropout. The
circuit board will then initiate generator cranking and startup after a time delay circuit times out.
Figure 4 is a schematic representation of the transfer switch with generator power available, waiting to transfer.

• Generator voltage available E1, E2.
• Circuit board action holding Wire 23 open to ground.
• Power available to standby coil C2, upon closure of TR1, normally open contacts (9 & 6) will close and initiate a

transfer.

Page 63

TRANSFER SWITCH

sEctioN 3.2

oPEratioNal aNalYsis

Part 3

Figure 4. Generator Power Available, Waiting to Transfer.

Advertising
This manual is related to the following products: