2. Test for utility source line-to-line voltage across Terminal

Lugs N1 and N2 (see Figure 1). Normal utility source

voltage should be indicated.

RESULTS:

1. If low or no voltage is indicated, find the cause of the

problem and correct.

2. If normal utility source voltage is indicated, refer to

Flow Chart.

teSt 40 – check Battery charGer

Supply VoltaGe

“pre-Wire load center”

DISCUSSION:
The battery charger is supplied with 120 VAC. The
output of the battery charger is 13.4 VDC / 2.5A.

PROCEDURE:
Refer to Figure 11.

1. Set VOM to measure AC voltage.
2. Measure across points A and B. 240 VAC should be

measured.

a. If 240 VAC is not measured, verify load source

voltage.

b. If 240 VAC is measured go to Step 3.

3. Measure across points A and C. 240 VAC should be

measured.

a. If 240 VAC is not measured, repair or replace

Wire T1.

b. If 240VAC is measured, proceed to Step 4.

4. Measure across points A and D. 240 VAC should be

measured.

a. If 240 VAC is not measured, replace fuse F3.

b. If 240VAC is measured, proceed to Step 5.

5. Remove Fuse F3. Measure across points D and C.

120 VAC should be measured.

a. If 120 VAC is not measured, verify neutral wire

is connected at point E. If good, replace battery
charger, then retest.

b. If 120VAC is measured, refer to Flow Chart.

teSt 41 – check Battery charGer

output VoltaGe

“pre-Wire load center”

DISCUSSION:
The battery charger is supplied with 120VAC. The out-
put of the battery charger is 13.4 VDC / 2.5A.

PROCEDURE:
Refer to Figure 11.

1. Set VOM to measure DC voltage.
2. Remove Wire 0 and Wire 15B from transfer switch

terminal strip points F and G.

3. Measure across points H and I. Battery supply voltage

(12 VDC) should be measured.

a. If battery voltage is not measured, wait 5 minutes

and repeat Step 3.

b. If battery supply voltage is still not available,

refer to Flow Chart.

c. If battery voltage is measured, proceed to Step 4.

4. Reconnect Wire 0 and Wire 15B previously removed

in Step 2.

5. Measure across points H and I. 13.4 VDC should

be measured.

a. If 13.4 VDC is not measured, replace the

battery charger

b. If 13.4 VDC is measured, the charger is working.

*note: Battery charger voltage will be higher than
battery supply voltage.

teSt 42 – check Wire 0 and Wire15B

“pre-Wire load center”

DISCUSSION:
In order for the battery charger to function, battery supply
voltage must be available to the battery charger.

PROCEDURE:
Refer to Figure 11.

1. Set VOM to measure DC voltage.
2. Disconnect Wire 0 and Wire 15B from generator terminal

strips, locations J and K.

3. Wait five (5) minutes after removing wires.
4. Measure across points L and M on the terminal strip.

12 VDC should be measured.

a. If 12 VDC is measured, proceed to Step 6.

b. If 12 VDC is not measured, proceed to Step 5.

5. Measure across points M and N. 12 VDC should be

measured.

a. If 12 VDC is measured, repair or replace Wire

0 between the generator terminal strip and the
ground lug.

b. If 12 VDC is not measured, proceed to Step 8.

6. Set VOM to measure resistance.
7. Connect the meter test leads across the disconnected

Wire 0 and Wire 15B. Approximately 115 Ohms should

be measured.