Installing the operator information panel assembly – Lenovo THINKSERVER RS210 User Manual

Page 143

Advertising
background image

6.

Lift the operator information panel assembly out of the server.

7.

If you are instructed to return the operator information panel assembly, follow all packaging
instructions, and use any packaging materials for shipping that are supplied to you.

Installing the operator information panel assembly

To install the replacement operator information panel assembly, complete the following steps:
1.

Guide the operator information panel assembly into position on top of the DVD bay housing. Make
sure that the LEDs and the USB connectors are aligned with the openings in the bezel and that the
holes in the board align with the screw holes in the top of the bay housing.

2.

Use the screws that you removed earlier to secure the operator information panel assembly onto the
top of the DVD bay housing.

3.

Reconnect both cables to the operator information panel assembly.

1

Operator information panel assembly

2

Front panel USB connector

3

Operator information panel connector

4.

Go to “Completing the FRU replacement” on page 173.

Chapter 6. Replacing FRUs

135

Advertising