Setting up rack to mount – Nortel Networks Sun Fire V100 User Manual

Page 23

Advertising
background image

MCS 4-server Sun Fire V100 Solaris Installation and Commissioning Guide

23

Copyright © 2006 Nortel Networks

Setting up rack to mount

Procedure 1 Setting up rack to mount

At the rack,

1

Mount all equipment on the rack: Refer to following diagram that
displays the mounting for the rack.

Mount Layer-2 switch.

Mount MRV terminal server.

Mount Sun Fire V100s.

— Management/Accounting server

— Database server

— Application server

— IPCMProvWCM server

(optional equipment) Mount conference server. Refer to the
Media Application Server documentation for more
information.

(optional equipment) Mount gateway. Refer to
customer-specific gateway installation documentation.

Note: All MCS 5100 equipment is 19-inch rack mountable.

Advertising