Installation procedures, Step 1- identify materials, Warning – Xylem IM131R01 AQUAVAR AV II User Manual

Page 10: Part quantity

Advertising
background image

Step 1- Identify Materials

The following materials are provided with the AQUAVAR II controller. Please familiarize yourself with each prior to
installation.

Part

Quantity

1. AQUAVAR Controller

1

2. Pressure Transducer Assembly

1

a. Pressure transducer - 25 bar

1

/

4

” NPT

b. Transducer adapter - (available as

1

/

4

” NPT female threads &

3

/

8

B male thread per

separate part only) See price book.

UNI ISO/228/1 (British Standard pipe threads)

c. 30 ft. transducer cord (standard)

for AV II.

THE

AQUAVAR CONTROLLER AND PUMP MUST BE TOTALLY DISCONNECTED FROM ALL

POWER SUPPLY SOURCES BEFORE BEGINNING INSTALLATION OR REPAIR.

WARNING

FAILURE TO DISCONNECT ELECTRICAL POWER BEFORE ATTEMPTING ANY MAINTE-
NANCE CAN CAUSE SHOCK, BURNS, OR DEATH.

WARNING!

WARNING

Hazardous voltage
can shock, burn or
cause death.

3 . 4 5

1 . 0 7

3

4

” HEX

1

4

” NPT

2c

2a

2b

(If needed.)

9

Installation Procedures

YOU MUST USE THE CABLE THAT IS PROVIDED WITH THE TRANSDUCER. DO NOT USE
DIFFERENT CABLES OR OLDER STYLE CABLES.

Note

Advertising