3 commissioning, 1 scope of delivery, 2 power supply – YSI TruLab 1320P User Manual

Page 11: 3 initial commissioning, Commissioning, Scope of delivery, Power supply, Initial commissioning, 3commissioning

Advertising
background image

TruLab pH/ISE 1320

Commissioning

ba76157e01

03/2014

11

3

Commissioning

3.1

Scope of delivery

pH meter TruLab pH/ISE 1320

4 batteries 1.5 V Mignon type AA

Power pack

USB cable (A plug on mini B plug)

Stand

Stand holder

Comprehensive operating manual

Short instructions

CD-ROM with

– USB drivers
– detailed operating manual
– Software MultiLab Importer

3.2

Power supply

The TruLab pH/ISE 1320 is supplied with power in the following ways:

Mains operation with the supplied power pack

Battery operation (4 x alkaline manganese batteries, type AA)

USB operation via a connected USB-B cable

3.3

Initial commissioning

Perform the following activities:

Insert the supplied batteries

For mains operation: Connect the power pack

If necessary, mount a stand

Switch on the meter

(see section 5.2 S

WITCHING

ON

THE

METER

, page 19)

Set the date and time

(see section 5.4.6 E

XAMPLE

2

ON

NAVIGATION

: S

ETTING

THE

DATE

AND

TIME

,

page 25)

Advertising
This manual is related to the following products: