Yokogawa IR400 User Manual

Page 110

Advertising
background image

9 - 15

IM 11G02N01-01E

NO

2

/NO Converter

Part number: K9350LE (Non-CE conformity)
K9350LF (CE conformity)
Mounting: Indoor surface mounting
Target Gases: General boiler exhaust gas,

atmosphere

Catalyst: Amount; 2 cm

3

Replacement cycle; Approx. 12 months
(at flow rate of 0.3 L/min with 5% O

2

,

10 ppm NO)
Temperature setpoint; 210

Ϯ

10

Њ

C

(Sensing tip: K thermocouple)

Wetted materials: Ceramic, Viton, glass filter, SUS31
Conversion efficiency: 90% or higher, conforms to JIS
Gas Flow Rate: 0.5 L/min
Ambient Temperature: -5 to +45

Њ

C

Power Supply: 100 VAC , 50/60 Hz (K9350LE)
100 to 240 VAC , 50/60 Hz (K9350LF)

Power Consumption:

Approx. 85 VA

Safety conforming standards:

EN61010-1
Pollution degree 2
Installation category II

Weight:

Approx. 1.1 kg (K9350LE)
Approx. 1.2 kg (K9350LF)

Sample gas requirements:

Dust/drain removed, gas temperature at
150

Њ

C or less

T15.eps

Catalyst for NO

2

/NO converter

Glass wool for NO

2

/NO converter

Fitting for NO

2

/NO converter

Part No.

K9350LP

K9350LQ

K9350LV

Qty

2
2

2

One-year-Use Spare Parts

Item

External Dimensions

7 8

100V AC

(Shared with internal wiring)

Wiring Diagram

Gas Inlet

л

9.5/

л

5.5

4-

л

5

135

(120)

105

(210)

Approx.130

110

(150)

Gas Outlet

л

9.5/

л

5.5

Unit: mm

K9350LE

K9350LF

Advertising