Maintenance, 1 daily check, 2daily check and maintenance procedures – Yokogawa IR400 User Manual

Page 82: 2 daily check and maintenance procedures

Advertising
background image

7 - 1

IM 11G02N01-01E

7.1 Daily check

(1) Zero calibration and span calibration

1.

Perform zero calibration. For the calibration procedures, refer to “Item 6.9.1 Zero calibra-
tion”.

2.

Then, perform span calibration. For the calibration procedures, refer to “Item 6.9.2 Span
calibration”.

3.

Zero calibration and span calibration should be carried out once a week, as required.

(2) Flow rate check

1.

Sampling gas flow and purge gas flow are as follows:

Sampling gas flow:

0.5

±

0.2L/min

Purge gas flow:

About 1L/min

2.

Check and maintenance should be carried out every day, as required.

7.2 Daily check and maintenance procedures

Table 7.1 Maintenance and check table

7. MAINTENANCE