1 minimizing settling errors, 2 measuring the necessary settling time, Table 57. crbasic measurement settling times – Campbell Scientific CR1000 Measurement and Control System User Manual

Page 287

Advertising
background image

Section 8. Operation

287

 

Table 57. CRBasic Measurement Settling Times

Settling

Time

Entry

Input

Voltage

Range

Integration

Code

Settling

Time

1

0 All

250

450 µs (default)

0 All

_50Hz

3 ms (default)

0 All

_60Hz

3 ms (default)

>100 All

X

2

μs entered

1

Minimum settling time required to allow the input to settle to CR1000 resolution specifications.

2

X is an integer >100.

A settling time is required for voltage measurements to minimize the effects of the
following sources of error:

• A small switching transient occurs when the CR1000 switches to the single-

ended or differential channel to be measured.

• A relatively large transient may be induced on the signal conductor via

capacitive coupling during a bridge measurement from an adjacent excitation
conductor.

• 50-Hz or 60-Hz integrations require a relatively long reset time of the internal

integration capacitor before the next measurement due to dielectric
absorption.

8.1.2.8.1 Minimizing Settling Errors

When long lead lengths are required the following general practices can be used
to minimize or measure settling errors:

• Do not use wire with PVC-insulated conductors. PVC has a high dielectric,

which extends input settling time.

• Where possible, run excitation leads and signal leads in separate shields to

minimize transients.

• When measurement speed is not a prime consideration, additional time can be

used to ensure ample settling time. The settling time required can be
measured with the CR1000.

8.1.2.8.2 Measuring the Necessary Settling Time

Settling time for a particular sensor and cable can be measured with the CR1000.
Programming a series of measurements with increasing settling times will yield
data that indicate at what settling time a further increase results in negligible
change in the measured voltage. The programmed settling time at this point
indicates the true settling time for the sensor and cable combination.

CRBasic example Measuring Settling Time

(p. 288)

presents CRBasic code to help

determine settling time for a pressure transducer utilizing a high-capacitance
semi-conductor. The code consists of a series of full-bridge measurements
(BrFull()) with increasing settling times. The pressure transducer is placed in

Advertising