JLG X17J Operator Manual User Manual

Page 101

Advertising
background image

97

BOOM LIFT MODELS X17J

JLG

X17JR0420113

6.5.6 E

MERGENCY OPERATIONS ON THE CARRIAGE

:

MOVING THE PLATFORM STABILISERS USING THE

HAND PUMP TO ALLOW THE MACHIE TO BE TRANSPORTED

To raise the stabilisers from the ground in order to be able to transport the machine, pro‑
ceed as follows:

‑ Check that the machine is completely closed and aligned.

‑ Remove the protection plugs and use the appropriate devices to completely tighten the

two proportional valves fitted on the two distributors (A).

‑ To move the left stabilisers, move the deviator on the hydraulic hand pump to the corre‑

sponding position.

‑ Use the ON‑OFF coil levers (B) to enable the required movement and simultaneously ope‑

rate the hand pump to deliver oil to allow the movement (photo C).

‑ To move the right stabilisers, move the deviator on the hydraulic hand pump to the corre‑

sponding position.

‑ Use the ON‑OFF coil levers (B) to enable the required movement and simultaneously ope‑

rate the hand pump to deliver oil to allow the movement (photo C).

Once these emergency operations have been carried out, completely unscrew the knob

on the proportional valve of the carriage distributor on the right and left side and put
back the plugs.

T

HE HYDRAULIC PUMP CAN BE USED TO MOVE THE STABILISERS AND SET THE MACHINE IN THE

TRANSPORT CONFIGURATION ONLY AFTER CLOSING COMPLETELY THE AERIAL PART OF THE
PLATFORM

.

P

ROPORTIONAL VALVES

A

photo C

B

ON

OFF LEVERS

Advertising