Appendix – Lenze E82ZAFPC010 User Manual
Page 90
Advertising
Appendix
Parallel operation of AIF and FIF interfaces
l
90
EDS82ZAFPC010 EN 4.0
Notes on parallel operation
For internal voltage supply, the jumper
0 must be plugged on at the indicated position.
0
8200vec073
External voltage supply (delivery state)
Voltage supply through internal voltage source
0
0
Advertising
This manual is related to the following products: