Appendix – Lenze E82ZAFPC010 User Manual

Page 90

Advertising
background image

Appendix

Parallel operation of AIF and FIF interfaces

11

l

90

EDS82ZAFPC010 EN 4.0

Notes on parallel operation

For internal voltage supply, the jumper

0 must be plugged on at the indicated position.

0

8200vec073

External voltage supply (delivery state)

Voltage supply through internal voltage source

0

0

Advertising
This manual is related to the following products: