2 short set-up (factory setting), 1 switch-on sequence, Commissioning – Lenze 8240 HVAC Series User Manual
Page 42
![background image](/manuals/566193/42/background.png)
Commissioning
5-2
UOOuhäáã~_^NMMO
5.2
Short set-up (factory setting)
5.2.1
Switch-on sequence
Step
1.Switch on mains voltage
2.Select the direction of rotation.
D
CW rotation:
- Apply a LOW signal to terminal E4 (0...+3V).
D
CCW rotation:
- Apply a HIGH signal to terminal E4 (+12...+30V).
3.Select the setpoint.
Apply a voltage 0...+10 V to terminal 8.
4.Enable the controller.
Apply a HIGH signal (+12...+30V) to terminal 28.
5.The drive is now operating according to factory setting.
5.2.2
Factory setting of the most important drive parameters
Setting
Code
Factory setting
Adaption to
the application
Operating mode
C001
-0-
Setpoint selection via terminal 8
Control via terminals
Parameter setting via 8201BB
See code table,
chapter 7.2
Terminal configuration
C007
-0-
E4
E3
E2 E1
CW/CCWDC brakeJOG1/2/3
See code table,
chapter 7.2
Machine data
Chapter 5.3 ff.
Speed range
Min. field frequency
C010 0.00 Hz
Chapter 5.3.1
p
g
Max. Field frequency
C011 50.00 Hz
p
Acceleration and
deceleration
Acceleration time
C012
5.00 s
Chapter 5.3.2
deceleration
times
Deceleration time
C013
5.00 s
Current limit
l
Motor mode
C022
150 %
Chapter 5.3.3
values
Generator mode
C023
80 %
p
Drive performance
Chapter 5.4 ff.
Current,
torque,
Operating mode
C014
-4-
Motor-current control
Motor-current
control
torque,
power
characteristic
V/f rated frequency
C015 50.00 Hz
control
chapter 5.4.2.2
V/f characteristic
control
V
min
setting
C016
0,00 %
control
D
with constant
V
min
boost, see
Slip compensation
C021
0,0 %
V
min
boost, see
chapter
5.4.2.1
Show/Hide Bookmarks