Commissioning – Lenze 8240 HVAC Series User Manual

Page 59

Advertising
background image

Commissioning

5-19

UOOuhäáã~_^NMMO

Task (FIG 5-3):

fе ~ н~ев нЬЙ п~нЙк бл нз ДЙ ЬЙдЗ ~н ~ Езелн~ен äÉîÉäK qЬЙ лйЙЙЗ зС нЬЙ ймгй гмлн ДЙ

ЕзенкзддЙЗ ЗЙйЙеЗбеЦ зе нЬЙ ~гзмен зС п~нЙк ÇÉäáîÉêÉÇK
cìåÅíáçåë млЙЗ

D

fåíÉêå~ä mfa ЕзенкзддЙк Сзк дЙоЙд ÅçåíêçäK
J kçêã~ä ÅçåíêçäI ~е~дзЦ лЙнйзбен лЙдЙЕнбзе об~ нЙкгбе~д U пбнЬ СЙЙЗД~Ев об~

~е~дзЦ беймн bN пбнЬ éäìÖJáå гзЗмдЙ UOTVK

`çÇÉ ëÉííáåÖëW

Code

Name

Possible settings

IMPORTANT

Lenze

Selection

C005 Configuration

-0-

-6-

Operation with closed-loop control; setpoint

via terminal 8 with digital frequency

feedback via terminal E1

C070 Gain

PID controller

1.00

1.00

Adapt to process

C071 Integral action time PID

controller

100

100 ms

Adapt to process

C072 Differential component

PID controller

0.0

0.0

Adapt to process

C074 Influence PID controller

0.0

100%

C238 Frequency precontrol

-1-

-0-

No precontrol

C239 Frequency setting range

-0-

-1-

Unipolar

Direction of rotation

cannot be changed via

process controller

All other parameters are based on the factory setting.
Set the rated motor data (depends on the motor used) under C088 (rated motor current) and C091 (motor cos φ).

Show/Hide Bookmarks

Advertising
This manual is related to the following products: