L-force | plc designer – Lenze PLC Designer PLC Designer (R3-1) User Manual
Page 166

L-force | PLC Designer
Standard menus and commands
164
DMS 4.1 EN 03/2011 TD29
Build menu: Commands for building the project, that is for doing a pre-compilation
run including a syntactical check; also commands for deleting the last compile
information (clean) which is of meaning for Online Change and for offline code-
generation.
Build
<F11>
Rebuild
Generate code
Generate runtime system files...
Clean
Online menu: Commands for logging in and out to/from the controller, for loading the
project on the controller and for reset.
Login
<Alt>+<F8>
Logout
<Ctrl>+<F8>
Create boot application
Download
Online Change
Source download to connected device...
Multiple_download
Reset warm
Reset cold
Reset origin
Debug menu: Commands for controlling the program run on the controller (start, stop)
and for debugging actions (breakpoints, stepping, writing, forcing).
Start
<F5>
Stop
<Shift>+<F8>
Single Cycle
New Breakpoint...
Toggle Breakpoint...
<F9>
Step Over
<F10>
Step Into
<F8>
Step Out
<Shift>+<F10>
Run to Cursor
Set next statement