L-force | plc designer – Lenze PLC Designer PLC Designer (R3-1) User Manual
Page 339
Advertising

L-force | PLC Designer
Menu Commands sorted by Categories
DMS 4.1 EN 03/2011 TD29
337
If naming conflicts are detected during the selection configuration, the following
dialog will be displayed:
Abb. 144 Dialog for selecting objects to get overwritten
The list shows all objects which have been selected for getting copied but are already
existing in the currently edited project.
All objects provided with a check mark will be overwritten during copying. The others
will be copied but renamed automatically with a unique name.
All will add a check mark to all entries, None will remove all check marks.
OK makes the copy process carry on and the copied objects will be added inserted in
the object trees of the currently edited project.
Advertising