Replacement of regular replacement parts – RKI Instruments GD-70D Series User Manual

Page 69

Advertising
background image

8 Maintenance

8-4. How to replace parts

- 69 -

GD-70D

<Replacement of Regular Replacement Parts>

List of recommended regular replacement parts

No. Item Maintenance

intervals

Replacement

intervals

Quantity

(pieces/unit)

1

Pump unit

0.5 year

1 - 2 years

1

2

Flow sensor

1 year

5 year

1


NOTE

The above replacement intervals are recommendation only. The intervals may change depending on the
operating conditions. These intervals do not mean the warranty periods either. The result of the regular
maintenance may determine when to replace the parts.

Replacement of Pump Unit


The pump unit can be replaced in a single step as shown in the
figure. When attaching the pump unit to the main unit, position
the grooves of the pump unit at the rails of the main unit and push
the pump unit.
Do not push the center diaphragm. Push the part labeled "PULL".
And as the connecting point (flow path) of the pump unit is
greased, be sure to check for any dust.


















Replacement of Flow Sensor


After the flow sensor is replaced, the operation must be checked
by a qualified service engineer.
For the stable operation of the detector and safety, ask a
qualified service engineer to take care of replacement of the
parts whose operation must be checked. Please contact our
sales department.







Groove

Rail

Connecting point
(flow path)

Do not push
here.

"PULL"

Ч

Advertising