Cabinet Handling Instructions
When lifting the Bulletin 7712 OneGear™ cabinet, the lifting instructions
specifi ed below must be followed.
Overhead Lifting Method
1. Verify that the front/back lifting channels and the middle cosmetic
channels are all installed and that the connecting hardware is tightened
to the cabinet.
2. Verify that the four (4) lifting clips have corresponding internal lifting
clips installed and connected. Lifting clip holes are 30 mm.
3. Figure 3.1 is only for lifting demonstration purpose. The lifting parts
may be different depending on customers’ decision and availability
of the lifting hardware. Verify shipping weight and capacity of lifting
equipment.
4. As shown in Figure 3.1, the angle between the slings and horizontal
must be 45° or more (70° is ideal).
5. The centre to centre distance of the two lifting points of the lifting
angle or beam is to be 882 mm +/- 150 mm (34” +/- 6.0”).