Rockwell Automation 7712 OneGear Motor Control Center FVNR Starter (7.2 kV) User Manual

Page 35

Advertising
background image

Equipment Installation

4-23

7712-IN001B-EN-P – June 2013

Once the top plate is off, you will see a partition barrier that will easily
slide up and out of the cabinet.

Figure 4.34 – Inside View of MV Power Compartment

(with Partition Barrier removed)

Once removed, you will easily be able to access the bus bar assembly. The top
bus bar is phase A, the next, phase B and the bar at the bottom is phase C.

Figure 4.35 – Phase A, B, and C Bus Bar Connections