Rockwell Automation 7712 OneGear Motor Control Center FVNR Starter (7.2 kV) User Manual
Page 43
Advertising
OneGear™ Standard Plenum Assembly Procedure
5-5
7712-IN001B-EN-P – June 2013
Figure 5.5c – Starter Plenum mounted on top of cabinet
11. Attach the outside backet (81023-075-02) at the front using M8 hardware
(M8 HHCS, 19 mm (0.75”) OD fl at washers and lock washers). Refer
to Figure 5.6.
Figure 5.6 – Attaching front outer bracket
Advertising