Rockwell Automation 7712 OneGear Motor Control Center FVNR Starter (7.2 kV) User Manual
Page 22
Advertising
![background image](/manuals/580586/22/background.png)
4-10 Equipment
Installation
7712-IN001B-EN-P – June 2013
Figure 4.15 – Distance from Obstructions at the Front of Starter Lineup
Figure 4.16 – Distance from Obstructions at the Sides/Back of Starter Lineup
I M P O R T A N T
I M P O R T A N T
The channels and external lifting lugs must be removed
prior to mating to any adjacent switchgear components.
I M P O R T A N T
I M P O R T A N T
The
equipment
must be placed on a fl at and level concrete
base that can withstand the weight of the equipment.
1300 mm
Control Wire Conduit Opening
Dimensions = inches [mm]
Mounting Holes for 0.50 [12] dia.
anchor bolts
150 mm
Load Cable Conduit Opening
Control Cable Conduit Opening
150 mm
50 mm
Dimensions = inches [mm]