Rockwell Automation 7712 OneGear Motor Control Center FVNR Starter (7.2 kV) User Manual
Page 28
Advertising
![background image](/manuals/580586/28/background.png)
4-16 Equipment
Installation
7712-IN001B-EN-P – June 2013
4.6.1.2 Joining Incoming Section to Starter
Place the incoming section and starter beside each other in their fi nal position.
Ensure the two units are in their correct position such that the joining holes
in one cabinet match the opposite bolt hole connections.
Figure 4.25 – Joining Incoming Section to Starter
(2) Front junction points
inside LV panel
(5) Front junction points
inside MV panel
Incoming Cabinet
Starter Cabinet
(7) Rear junction points
Connecting bolts
to seal around
bus opening
Advertising