4 - equipment installation, Equipment installation, Chapter – Rockwell Automation 7712 OneGear Motor Control Center FVNR Starter (7.2 kV) User Manual

Page 13

Advertising
background image

Equipment

Installation

Before joining to adjacent equipment, it is necessary to remove the lifting

angles, spacer, washer and bolt.

Figure 4.1 – Removal of Lifting Bracket

Chapter

4

7712-IN001B-EN-P – June 2013

Spacer, Washer
and Bolt

(2) Lifting Angles

4.1

Removal of Overhead

Lifting

Brackets

and

Channels

Advertising