3 removal of the contactor cart – Rockwell Automation 7712 OneGear Motor Control Center FVNR Starter (7.2 kV) User Manual

Page 15

Advertising
background image

Equipment Installation

4-3

7712-IN001B-EN-P – June 2013

Remove shipping bracing between contactor cart and structure. Inspect for
shipping

damage.

Figure 4.4 – View of Contactor Cart with open door and packing materials removed

Just below the contactor cart door, there are two pin holes that will receive
the pins on the service cart.

Roll service cart up to enclosure and ensure that the cart platform is at the
same elevation of rails on service cart and enclosures are equal.

4.3

Removal of the

Contactor

Cart

Advertising